WILLIAMS LAKE FIRST NATION NORTHSIDE MASTER PLAN

Williams Lake, BC · 2024

Concept plan for the Williams Lake First Nation Northside lands, keyed to roads, trails, wetlands, environmentally significant areas, badger dens, steep slopes, and geotechnical setbacks

The Williams Lake First Nation Northside Master Plan was initiated to act as an economic driver and to provide housing for both Nation and non-Nation Members. The Nation set out to meet its own members’ needs and those of the broader region at the same time, at a point when households across the area were struggling to find somewhere to live.

The approach began on the land. A comprehensive site observation phase recorded the Northside’s character areas and the feelings each one evoked when standing in it, which is a different and slower exercise than reading a parcel map. That reading of the place was then tested against a geotechnical assessment and an environmental impact assessment.

What those studies ruled out shaped the plan as much as what they allowed. A significant portion of the site, the environmentally sensitive areas and the hazard lands, was designated unsuitable for residential development. Ecologically significant wetlands, habitat areas, riparian areas, and endangered badger dens are protected, and steep slopes are avoided altogether. The result is a plan that works with the landscape rather than against it.

Within that framework the plan carries a full range of housing, from single-detached dwellings through duplexes and townhouses to apartment buildings, integrated into the landscape rather than imposed on it. Together they provide ~380 housing units, enough to serve a genuine mix of households rather than a single market.

Selkirk guided the site analysis, the concept plan, the final master plan, and the 3D renderings, working alongside TRUE Consulting.

The Master Plan has garnered significant support from Williams Lake First Nation Council, and that endorsement cleared the way for phase 1 detailed design to begin in the summer of 2024.